...

DPR

The draft alignment of the proposed Metro line from Vatika Chowk to Pachgaon (Manesar) has...
Work on the 28km metro corridor from Huda City Centre to Cyber City is expected...
The Gurugram Metropolitan Development Authority (GMDA) is planning to redevelop two key arterial roads –...
Construction of the much-awaited underpass at Vatika Chowk on Sohna Road is expected to start...
The detailed project report (DPR) for the metro line between Palam Vihar and Dwarka Sector...
Loading....

ENQUIRE NOW

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.